- All nuts & bolts of connectors at bus equipment are checked for their healthiness.
- Tightening of loose bolts.
- Replacement of damaged bolts of pad clamps.
- By passing / replacing of damaged connectors in bus.
- Replacing damaged jumpers from Bus to Isolator in no load conditions.
- Testing of Disk Insulators with Positron make microprocessor based, Insulator Tester.
- Replacing damaged disc insulator.
- Lubrication of Isolator mechanical joints for smooth operation.
- Cleaning & applying jelly to Isolator contacts in off condition.
|
|
|
|
|
 |